Comprehensive reference on all major and commonly used building contracts with a step-by-step approach to producing claims

Covering all the major and commonly used building contracts, Building Contract Claims considers the legal basis of building contract claims and shows what can and cannot be claimed, providing the contractor, employers and their advisors with a simple, concise, and effective source of information for use when preparing, submitting, or dealing with a claim.

This highly regarded book examines the legal basis of claims for extensions of time and additional payment under the main forms of construction contract. It includes chapters dealing with the principles for extensions of time, financial claims (including for variations or compensation events), common law and global claims, employer claims, duties of the employer's representative, substantiating claims, claims for time and money under the JCT 2016 and NEC4 contracts and sub-contracts, and claims for professional fees.

With the publication of the sixth edition, Building Contract Claims has been reordered to provide a step-by-step approach to producing claims and thoroughly revised to ensure it is fully up to date with the latest contracts, court judgments, and building practice. Updates include: - Revision of chapters covering extensions of time in line with the second edition of the Society of Construction Law's Delay and Disruption Protocol
- New material to reflect the JCT 2016 contracts and the NEC4 contracts
- Expanded coverage of employer claims
- Updated sections for JCT 2016 and NEC4 sub-contracts
- Claims for professional fees (for design consultants, contract administrators, quantity surveyors or project managers) under the commonly used conditions of engagement

The new edition of Building Contract Claims is an essential reference for contractors, contract administrators, project managers, and quantity surveyors, as well as architects, contracts consultants, and construction lawyers.

Higginbottom / Chappell Building Contract Claims jetzt bestellen!

Weitere Infos & Material


Preface xvii

Part I 1

1 Introduction 3

1.1 General Introduction to ‘Claims’ 3

1.1.1 General 4

1.1.2 Contractual Claims 4

1.1.3 Extension of Time and Loss and/or Expense 5

1.1.4 Variations 6

1.1.5 Unexpected Problems 6

1.2 Standard Forms of Contract Considered in This Book 7

1.2.1 JCT 2016 Contracts 8

1.2.2 NEC4 Contracts 9

1.3 Types of Claims by the Contractor 11

1.3.1 Contractual Claims 11

1.3.2 Common Law Claims 11

1.3.3 Quantum meruit Claims [Detailed Text Transferred to 4.5] 12

1.3.4 Ex gratia Claims 12

1.4 Types of Claims by the Employer 13

1.4.1 Delay Damages 13

1.4.2 Low Performance Damages 13

1.4.3 Reduction of the Contract Price for Non-CompliantWork 14

1.4.4 Other Claims 14

1.5 Structure of This Book 15

2 General Principles 17

2.1 Entitlement 17

2.1.1 Contractual Entitlement 17

2.1.2 Duty, Breach, Causation and Loss 20

2.2 The Burden of Proof 21

2.2.1 The Burden of Proof 21

2.2.2 Res Ipsa Loquitur – It Speaks for Itself 21

2.3 Causation 22

2.4 Categories of Claim 24

2.4.1 Prolongation 26

2.4.2 Disruption 28

2.5 The ‘Knock-on’ Effect 29

2.6 Damages 32

2.7 Mitigation [Prev 6.4] 33

2.7.1 Mitigation of Delay 33

2.7.2 Mitigation of Costs 34

2.8 Betterment 36

2.9 Notices 37

2.9.1 Requirement for Notice 38

2.9.2 Time Bar Clauses 39

2.9.3 Whether a Condition Precedent 41

2.9.4 Waiving the Requirement for Notice 42

2.9.5 Essential Elements of a Notice 43

2.9.6 Giving, Issue and Receipt of Notices 45

3 Time 47

3.1 General Points 47

3.1.1 Time Obligations in Building Contracts 47

3.1.2 Commencement Obligations 48

3.1.3 Progress Obligations 49

3.1.4 Completion Obligations (Including Partial Possession) 53

3.1.5 Time at Large 56

3.1.6 Time of the Essence 59

3.2 Extension of Time Clauses in Building Contracts 60

3.2.1 Basic Principles 60

3.2.2 The Prevention Principle 61

3.2.3 Onerous Clauses 62

3.2.4 Further Delays During a Period of Culpable Delay 62

3.3 Critical Path Analysis and Planning Software 63

3.4 The Society of Construction Law Delay and Disruption Protocol 66

3.5 Methods of Delay Analysis 67

3.5.1 Initial Steps: The Programme 67

3.5.2 Impacted as-Planned 74

3.5.3 Time Impact Analysis 77

3.5.4 As-built v As-planned 84

3.5.5 Collapsed As-built 87

3.5.5.1 Summary of Delay Analysis Methods 93

3.6 Float 95

3.6.1 ‘Financial’ Effects of Using up Float 97

3.6.2 ‘Time’ Effects of Using up Float 98

3.7 Concurrency 99

3.8 Acceleration 101

3.8.1 Introduction 101

3.8.2 Acceleration by Agreement or Instruction 102

3.8.3 Unilateral Acceleration 105

3.8.4 Constructive Acceleration 105

3.9 Sectional Completion 108

3.9.1 Where There Is a Single Date for Completion 108

3.9.2 Dependent Sections 109

3.10 ‘Milestone’ or Key Dates 112

3.11 Foreshortened Programme 113

3.11.1 Contractor’s Obligation to Complete 113

3.11.2 If the Contractor Could Have Completed Earlier 114

3.11.3 Late Information 115

4 Financial Compensation: Recovery of Direct Loss and/or Expense or Additional Costs 119

4.1 Definition 119

4.1.1 JCT 2016 v NEC4 Contracts – Different Approaches 120

4.1.2 JCT 2016 Contracts – ‘Direct Loss and/or Expense’ 120

4.1.3 NEC4 – ‘Change in the Prices’ 121

4.2 Direct v Indirect 122

4.3 Exclusion of Indirect or Consequential Loss 123

4.4 The More Common Heads of Loss 126

4.4.1 General Principles 126

4.4.2 Prolongation Costs 126

4.4.2.1 On-site Establishment Costs 127

4.4.2.2 Management Personnel Costs 128

4.4.2.3 Plant 129

4.4.2.4 WinterWorking 132

4.4.2.5 Head Office Overheads 132

4.4.2.6 Loss of Profit 137

4.4.3 Disruption Costs – UneconomicWorking 138

4.4.4 Other Costs 141

4.4.4.1 Increased Costs 141

4.4.4.2 Interest 143

4.4.4.3 Financing Charges 144

4.4.5 Costs of a Claim 145

4.4.6 Sub-Contractor Claims 147

4.5 Quantum Meruit Claims 148

4.5.1 Circumstances Giving Rise to Quantum Meruit Claims 148

4.5.2 Valuation of Quantum Meruit Claims 149

4.6 Exclusive Remedy Clauses 150

4.7 Claims at Termination of Contractor’s Employment 151

4.7.1 Termination Claims Under JCT 2016 Contracts 151

4.7.2 Termination Claims Under NEC4 156

5 Claims for Variations Under the Contract, Acceleration, Bonus Clauses and Contractor’s Share 161

5.1 Definitions and Scope 161

5.1.1 Definition of a ‘Variation’ 162

5.1.2 Scope of a ‘Variation’ – Contract Documents 164

5.1.3 Scope of a Variation – Bills of Quantities 166

5.1.4 Other Pricing Documents 172

5.2 JCT 2016 Contracts – Definitions of Variations 172

5.2.1 Alteration of Design, Quality or Quantity of theWork 172

5.2.2 Changes or Restrictions Imposed by the Employer 175

5.2.3 Instructions and Other Circumstances Giving Rise to a ‘Variation’ 178

5.2.3.1 Corrections to Contract Documents (Resolving Discrepancies, Ambiguities, Inadequacies, etc.) 179

5.2.3.2 Instructions 183

5.2.3.3 Design Submission Procedure and Contractor’s Designed Portion (‘CDP’) 191

5.3 NEC4 Contracts – Definition of ‘Compensation Events’ (Including Variations) 193

5.3.1 NEC4 – Compensation Events 193

5.3.2 NEC4 – Compensation Event Procedure 196

5.4 Valuation Under JCT 2016 Contracts 203

5.4.1 The ‘Valuation Rules’ and Their Application 206

5.4.1.1 Valuation by Measurement 207

5.4.1.2 If theWork Cannot be Measured – Valuation on a Daywork Basis 212

5.4.1.3 Valuation of the Contractor’s Design (Including the ‘Contractor’s Designed Portion’) and ‘Provisional Sums’ 214

5.4.2 Variation and Acceleration Quotations and Contractor’s Estimates 217

5.5 Valuation Under NEC4 Contracts (Including ‘Contractor’s Share’) 221

5.5.1 Assessing Changes to the Prices 223

5.5.2 Contractor’s Share (Options C and D) and Incentive Payment (Option X22) 230

5.6 Acceleration Provisions 233

5.6.1 Acceleration Under JCT SBC/Q 2016 and JCT DB 2016 233

5.6.2 Acceleration Under NEC4 234

5.6.3 Summary of Acceleration Provisions 234

5.7 Bonus Clauses 235

5.7.1 Contractor’s Share 236

5.7.2 Early Completion Bonus 236

5.7.3 ‘Budget Incentive’ for Early Contractor Involvement (Option X22) 236

5.7.4 Bonus Clauses and Acts of Prevention 237

6 Basis for Common Law Claims 239

6.1 General 239

6.1.1 Authority of Employer or His Representative 241

6.1.2 Effect of ‘Final Certificates’ 242

6.2 Implied Terms 243

6.2.1 General Principles 243

6.2.2 Terms Implied (or Imposed) by Statute 244

6.2.3 Common Law (Case Law) 245

6.2.4 Other Bases for Implied Terms in Building Contracts 249

6.3 Variation of the Contract Itself (Not a Variation Under the Terms of the Contract) 249

6.4 Omission ofWork to Give it to Others 250

6.5 ExtraWork 253

6.6 Possession of the Site 255

6.6.1 General Position 255

6.6.2 Sufficient Possession 255

6.6.3 Failure to Give Possession 256

6.6.4 Deferring Possession and Suspension by the Employer 257

6.7 Incorrect Information 258

6.7.1 Basis of Claim 258

6.7.2 Provision of Correct Information 258

7 Global Claims 263

7.1 General Points 263

7.2 Basic Principles of Global Claims 263

7.3 The Current Position 265

7.4 Summary 267

8 Employer Claims Against the Contractor 269

8.1 General 269

8.2 Delay Damages (Liquidated damages) for Late Completion 270

8.2.1 The Meaning and Purpose of Liquidated Damages 270

8.2.2 Liquidated Damages Clauses Must be Clear and Unambiguous 272

8.2.3 ‘Liquidated Damages’ or a ‘Penalty’ 273

8.2.4 The Sum Expressed as Liquidated Damages and its Calculation 276

8.2.5 Liquidated Damages as the Only Remedy 279

8.2.6 Where There Is Partial Possession 280

8.2.7 Maximum Recovery – Including a Damages ‘cap’ 282

8.3 Procedures for Deducting Liquidated Damages for Late Completion 284

8.3.1 General Points 284

8.3.2 Liquidated Damages Under JCT 2016 Contracts 284

8.3.3 Liquidated Damages Under NEC4 286

8.3.4 Damages for Late Completion Summary 288

8.4 Defences to Liquidated Damages for Late Completion 288

8.4.1 By Agreement 288

8.4.2 Deficiencies in the Building Contract 291

8.4.3 Employer Failing to Observe the Contract Terms 291

8.4.4 Time Has Been Extended 292

8.4.5 Time Is at Large 292

8.4.6 The Contract Is Terminated 293

8.4.7 The Stipulated Sum Is Actually a Penalty 294

8.5 Defects: Reduction/Abatement of the Contract Price 295

8.5.1 General Points 295

8.5.2 Abatement/Reduction of the Contract Price 295

8.5.3 Abatement Under JCT 2016 Contracts 296

8.5.4 Abatement Under NEC4 297

8.5.5 Costs of Rectifying DefectiveWork 298

8.6 Employer Claims for Other Breaches of Contract 300

8.6.1 Liquidated Damages for Failing to Construct theWork to a Specified Area (m2 or ft2) 300

8.6.2 Other Damages and Costs Payable Under NEC4 301

9 Duties of the Employer’s Representative 303

9.1 Employer’s Representatives (Architects’, Contract Administrator’s and Project Manager’s) Powers and Liability to the Contractor 303

9.1.1 General Points 303

9.1.2 Employer’s Representative(s) – General Duties 305

9.1.3 Employer’s Representative(s) – Relevant Duties 306

9.1.4 The Relevance of the Building Contract’s Terms 307

9.1.5 Agency 308

9.1.6 Employer’s Representative’s Authority, Exercising Discretion, and Making Decisions 309

9.1.7 Employer’s Representative and the Contractor 311

9.1.8 The Employer’s Representative’s Duties - Extensions of Time 311

9.1.9 Extension of Time Decisions and Time Limits 315

9.1.10 Loss and Expense Decisions and Time Limits 317

9.1.11 Employer’s Liability for Breaches by the Employer’s Representative 318

9.2 Quantity Surveyor ’s Role 319

9.2.1 Valuation ofWork 323

9.2.2 Direct Loss and/or Expense 323

9.2.3 Quantity Surveyor’s Duty 324

9.2.4 Duty to the Employer 325

9.2.5 Quantity Surveyor’s Liability to Others 326

9.2.6 Quantity Surveyor Functions Under JCT 2016 Contracts 326

9.2.7 Quantity Surveyor Functions Under NEC4 329

9.2.8 Commercial Settlements 330

10 Preparation and Substantiation of Claims 333

10.1 Preparing a Claim 333

10.1.1 Introduction 333

10.1.2 General Principles 334

10.1.3 Requests for Further Information 335

10.1.4 Setting Out the Claim 337

10.1.5 Likely Content of a Claim 339

10.2 Types of Evidence Required to Support a Claim 340

10.2.1 Introduction 340

10.2.2 The Explanation (or Narrative) 344

10.2.3 Time Records (Programmes and Similar Documents) 346

10.2.4 Cost Records 347

10.2.5 Correspondence and Similar Documents 349

10.2.6 Photographs, Time-Lapse Video 350

10.2.7 Other Records (Site Meetings, Site Diaries, Labour Returns) 350

10.2.8 A Scott Schedule 352

Part II 355

11 Extensions of Time Under JCT 2016 Contracts 357

11.1 Introduction 357

11.1.1 Definitions and Interpretation 357

11.1.2 The Contractor’s Obligation to Notify a Delay to Progress 359

11.2 The Contractor’s Notifications 359

11.2.1 The Notice 359

11.2.2 Particulars of the Delay(s) Expected Effects 362

11.2.3 Updates: Material Change in Estimated Delay 363

11.3 Fixing a New Completion Date 363

11.3.1 Introduction 363

11.3.2 Fixing a New Completion Date During the Course of theWork 365

11.3.3 Fixing a New Completion Date After the Completion Date Has Passed 372

11.3.4 Other Conditions for Extensions of Time 373

11.4 Relevant Events – Grounds for Extensions of Time 375

11.4.1 Variations or Changes 375

11.4.2 Instructions 375

11.4.3 Deferment of Possession 375

11.4.4 Antiquities 378

11.4.5 Inaccurate Approximate Quantities 379

11.4.6 Contractor’s Suspension for Nonpayment 379

11.4.7 Impediment, Prevention or Default by the Employer 380

11.4.7.1 Late Provision of Information 381

11.4.7.2 Work Not Forming Part of the Contract 383

11.4.7.3 Provision of Materials or Goods by the Employer 383

11.4.7.4 Failure to Give Access, Ingress or Egress 385

11.4.7.5 Compliance or Non-compliance with CDM Regulations 2015 385

11.4.8 Statutory Undertaker’sWork 386

11.4.9 Exceptionally AdverseWeather Conditions 387

11.4.10 Loss or Damage Occasioned by One or More of the Specified Perils 388

11.4.11 Civil Commotion or the Use or Threat of Terrorism 389

11.4.12 Strikes, Lock Out etc. 389

11.4.13 New Legislation After the Base Date 390

11.4.14 Delay in Receiving the Necessary Permissions (JCT DB 2016 only) 390

11.4.15 Insolvency of a ‘Named Specialist’ (JCT SBC/Q 2016 only) 391

11.4.16 ‘Named Sub-Contractors’ (JCT IC 2016 Only) 392

11.4.17 Force Majeure 394

12 Loss and/or Expense under Jct 2016 Contracts 397

12.1 Introduction 397

12.1.1 General Points 397

12.1.2 No Relationship Between Relevant Matters and Relevant Events 400

12.2 The Contractor’s Application and Assessment 402

12.2.1 The Key Loss and Expense Clause 402

12.2.2 Commentary on the Key Loss and Expense Clause 403

12.2.3 Content of the Contractor’s Application 406

12.2.4 Timing of the Contractor’s Notification (‘Relevant Matters’) 407

12.2.5 Meaning of Loss and Expense 411

12.2.6 Reimbursement Under Other Conditions of the Contract 411

12.2.7 Quotations and Estimates for Loss and Expense and Acceleration 413

12.2.8 Effect on Regular Progress 415

12.2.9 Provision of Further Information 416

12.2.10 ‘Form and Manner’ of Requested Information 419

12.3 Ascertainment by the Employer or His Representative 419

12.3.1 Criteria for Ascertaining Loss and Expense 419

12.3.2 Ascertainment 421

12.3.3 Timing, Content and Detail of the Ascertainment 423

12.3.4 Matters within the Employer’s or His Representative’s Knowledge 425

12.4 The ‘Relevant Matters’ 427

12.4.1 Deferment of Possession 427

12.4.2 Variations or Changes 428

12.4.3 Other Circumstances Giving Risk to a Variation (or change) 429

12.4.4 Instructions 429

12.4.5 Antiquities 431

12.4.6 Contractor Suspending Performance of His Obligations 432

12.4.7 Inaccurate Approximate Quantities 432

12.4.8 Delay in Receiving Permissions (JCT DB 2016 only) 433

12.4.9 Impediment, Prevention or Default by the Employer 433

12.4.10 Amounts Ascertained to Be Added to the Contract Sum 434

12.4.11 Contractor’s Other Rights and Remedies 435

13 Claims Under NEC 4 437

13.1 Introduction 437

13.1.1 Compensation Events 438

13.1.2 Compensation Events Procedure 438

13.2 Assessing Changes to the Prices 438

13.3 Assessing a Delay to the Completion Date and/or a Key Date 438

13.4 The Project Manager’s Assessments 441

13.4.1 Clause 64 – the Project Manager’s Assessments 441

13.5 The Compensation Events 442

13.5.1 Project Manager’s Instructions Changing the Scope – Clause 60.1(1) 443

13.5.2 The Client’s Failure to Allow Access to and Use of Part of the Site by Whichever is the Later of the Access Date and the Date Shown on the Accepted Programme – Clause 60.1(2) 443

13.5.3 The Client Fails to Provide Something by the Date in the Accepted Programme – Clause 60.1(3) 445

13.5.4 The Project Manager’s Instruction to StopWork or Not to StartWork or Changing a Key Date – Clause 60.1(4) 446

13.5.5 The Failure of the Client or Others24 toWork (a) Within the Times on the Accepted Programme or (b) the Conditions Stated in the Scope or (c) Carrying OutWork on the Site that’s Not in the Scope – Clause 60.1(5) 446

13.5.6 The Project Manager or the Supervisor Fails to Respond to a Communication Within the Agreed Period – Clause 60.1(6) 447

13.5.7 The Project Manager gives Instructions about an Object of Value, or Historical or Other Interest Found Within the Site – Clause 60.1(7) 449

13.5.8 The Project Manager or Supervisor Changes a Decision Previously Communicated to the Contractor – Clause 60.1(8) 449

13.5.9 The Project Manager Withholds an ‘acceptance’ for a Reason Not Stated in the Contract – Clause 60.1(9) 450

13.5.10 No Defect is Found After the Supervisor Instructs the Contractor to Search – Clause 60.1(10) 450

13.5.11 A Test or Inspection Carried Out by the Supervisor Causes Unnecessary Delay – Clause 60.1(11) 451

13.5.12 Physical Conditions Encountered by the Contractor Within the Site – Clause 60.1(12) 452

13.5.13 A ‘weather measurement’ is Recorded – Clause 60.1(13) 454

13.5.14 An event which is ‘Client’s liability’ Occurs – Clause 60(14) 456

13.5.15 Taking Over of Part of theWorks is Certified by the Project Manager before Both Completion and the Completion Date – Clause 60.1(15) 457

13.5.16 The Client Fails to Provide Materials, Facilities and Samples for Tests in Accordance with the Scope – Clause 60.1(16) 458

13.5.17 The Project Manager Notifies a Correction to an Assumption Regarding a Compensation vent – Clause 60.1(17) 458

13.5.18 The Client Commits a Breach of the Contract that’s Not a Compensation Event – Clause 60.1(18) 458

13.5.19 An Event that Prevents the Contractor Completing theWorks in Accordance with the Contract Occurs – Clause 60.1(19) 459

13.5.20 The Contractor is Notified by the Project Manager that a Quotation for a Proposed Instruction is Not Accepted – Clause 60.1(20) 460

13.5.21 Additional Compensation Events in Contract Data Part One – Clause 60.1(21) 461

13.5.22 Main Options B and D – A Difference Between the Final Quantity ofWork Done and the Quantity for an Item in the Bill of Quantities – Clause 60.4 462

13.5.23 Main Options B and D. A Difference Between the Final Total Quantity ofWork Done and the Quantity for an Item in the Bill of Quantities at the Contract Date which Delays Completion or a Key Date – Clause 60.5 464

13.5.24 Main Options B and D. Project Manager Corrects Mistakes in the Bill of Quantities which are Corrected by the Project Manager – Clause 60.6 464

13.5.25 Main Options B and D. Correcting an Inconsistency Between the Bill of Quantities and Another Document When Assessing a Compensation Event – Clause 60.7 465

13.5.26 Secondary Option X2.1. The Applicable Law Changes After the Contract Date 465

13.5.27 Secondary Option X12.3(6) An Instruction Given by the Core Group to the Partners to Change the Partnering Information 466

13.5.28 Secondary Option X14.2 – Delay in Making the Advanced Payment 466

13.5.29 Secondary Option X15.2 – The Correction of a Defect for Which it was Not Liable by the Contractor 467

13.5.30 Secondary Option Y(UK)2 Y2.5 Suspension of Performance by the Contractor under the Housing Grants, Construction and Regeneration Act 1996 (‘the Act’) 467

Part III 469

14 Sub-Contract Claims 471

14.1 Introduction 471

14.1.1 JCT 2016 Sub-Contracts 472

14.1.2 NEC4 Sub-Contract 474

14.2 Variations Under the Sub-Contracts 475

14.2.1 Variations Under the JCT 2016 Sub-Contracts 475

14.2.2 NEC4 Sub-Contracts 477

14.3 Extensions of Time Under Sub-Contracts 481

14.3.1 JCT 2016 Sub-Contracts’ Delay Notifications 481

14.3.2 JCT 2016 Sub-Contracts: Fixing Period for Completion 485

14.3.3 JCT 2016 Sub-Contracts: Relevant Sub-Contract Events 488

14.3.4 NEC4 Sub-Contracts 506

14.4 Loss and Expense Under the Sub-Contracts 507

14.4.1 JCT 2016 Sub-Contractor’s Application and Main Contractor’s Assessment 507

14.4.2 JCT 2016 Relevant Sub-Contract Matters 508

14.4.3 Reservation of Rights and Remedies 510

14.5 Main Contractor Claims Against Sub-Contractors 511

14.5.1 Main Contractor’s Claims 511

14.5.2 Delayed Completion by the Sub-Contractor 512

14.5.3 Common Heads of Loss and Expense Claimed by the Main Contractor Against the Sub-Contractor 514

15 Professional Fee Claims 517

15.1 Introduction 517

15.1.1 Means of Appointing Professional Consultants 517

15.1.2 Consultants’ Core Obligations 519

15.1.3 Client’s Core Obligations 523

15.1.4 Basis for Consultant’s Fees 523

15.1.5 The Basis for Charging for Consultant’s Fees 525

15.2 Claims Made by Consultants 527

15.2.1 Claims for ‘Variations’ (Additional Services) 528

15.2.2 Adjusting the Time (Programme) for the Consultants’ Services 528

15.2.3 NEC4 PSC Compensation Events 530

15.2.4 Consultant’s Claims for Extensions of Time 532

15.2.5 Consultant’s Claims for Additional Fees 536

15.2.6 Consultant’s Claims for Common law Damages 538

15.3 Client Claims Against Consultants 538

15.3.1 Establishing the Standard for the Consultant’s Services 539

15.3.2 Common Claims by the Client Against his Representative 539

15.3.3 Common Claims by the Client Against a Designer 540

15.3.4 Common Claims by the Client Against a Quantity Surveyor 541

Appendix A Example of Contractor’s Claim for Reimbursement of Direct Loss and/or Expense Under the JCT 2016 Contracts 543

A.1 Introduction 543

A.2 Example Particulars 544

A.3 Explanation of Costs or Expenditure 546

A.4 Loss and Expense for Employer Delay 1 – Details 549

A.5 Loss and Expense for Employer Delay 1 – Entitlement and Quantum 550

A.6 Loss and Expense for Employer Delay 2 – Details 550

A.7 Loss and Expense for Employer Delay 2 – Entitlement and Quantum 550

A.8 Observations for Loss and Expense for Employer Delay Claims 1 and 2 555

Appendix B Example of Compensation Event Claim Under NEC4 561

B.1 Introduction 561

B.1.1 Details of the Compensation Event 561

B.1.2 Observations on the Compensation Event Assessment 564

Index 581


Guy Higginbottom is an experienced consultant who spent much of his career working in private practice, including as Group Commercial Director for a large, regional building contractor. He has also held senior positions at global consultancies such as Atkins Réalis (formerly Faithful+Gould), and Arcadis. Guy is also the author of Wiley's 'Design and Build Contracts'.

David Chappell is an architect who has worked in both the public and private sectors, as well as acting as contract administrator for a building contractor.



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.