Buch, Englisch, 846 Seiten, Format (B × H): 171 mm x 250 mm, Gewicht: 1662 g
Reihe: Spon's Price Books
Buch, Englisch, 846 Seiten, Format (B × H): 171 mm x 250 mm, Gewicht: 1662 g
Reihe: Spon's Price Books
ISBN: 978-0-367-27108-4
Verlag: Taylor & Francis Ltd
A number of new engineering features have been added:
This year the lighting section has been entirely overhauled to accurately represent the latest industry standards in light fittings
The three exciting areas of development AECOM has this year identified in the MEP sector -- battery storage systems, exposed services and grid decarbonisation
Along with new items including MVHRs, district heating HIUs, and air source heat pumps
All the standard features you have come to expect from SPON'S MECHANICAL AND ELECTRICAL SERVICES PRICE BOOK are also included, considered essential for today’s services cost professional: detailed materials prices, labour constants, labour costs and measured work prices for mechanical and electrical works, from above ground drainage to automatic transfer switches, and circuit breakers to sprinkler systems an extensive Approximate Estimating section for quick, rule-of-thumb pricing of mechanical or electrical installations, together with elemental services costs for different types and standard of buildings full details of wage rates, daywork and cost indices on a national and Central London basis. an overhauled index and guidance notes updates, free of charge, twice a year – see inside for registration details. Updates are available online at www.pricebooks.co.uk
Autoren/Hrsg.
Fachgebiete
- Technische Wissenschaften Bauingenieurwesen Gebäudeausbau
- Wirtschaftswissenschaften Wirtschaftssektoren & Branchen Bauindustrie, Baugewerbe
- Technische Wissenschaften Bauingenieurwesen Massenermittlung, Aufmaß, Kostenplanung
- Technische Wissenschaften Bauingenieurwesen Baugewerbe, Bauplanung, Baubetrieb
Weitere Infos & Material
1. Engineering Features 2. Approximate Estimating 3. Material Costs/Measured Works Prices – Mechanical Installations 4. Material Costs/Measured Works Prices – Electrical Installations 5. Rates of Wages 6. Daywork 7. Tables and Memoranda